MS(PROJECT MANAGEMENT 1.5 YEARS) – 2nd PHASE SPRING 2024

Instructions for Downloading of Forms

Check your email for downloading Admission Fee Challan and payment details

Provisional Admission Forms

Please download relevant Provisional Admission Form, print, fill profile data, and bring along with original documents on Orientation Day or 1st Day of semester Start.
Provisional Admission Form for Postgraduate Programs.

Fee Concession Form

  1. Please download, print and fill relevant Fee Concession Form as per your Eligibility. Arrange and attach required documents and bring original documents on Interview Day.
    • PN Service/Civilian (Serving/Retired) – Self/Son/Daughter/Spouse (Download here)
    • Bahria University Graduate/Alumni (Download here)
    • High Achievers CGPA Based Concession (Download here)
    • Bahria University Employees – Self/Son/Daughter/Spouse (Download here)

Affidavit

  • Please download, print and fill AFFIDAVIT (on plain paper) and upload on your documents portal. There is no requirement to print it on stamp paper. Bring original on Interview Day. (Download here)

Instructions for Uploading Documents

  1. Scan the original documents (mentioned below) in Jpg/Jpeg format
  2. Use a scanner to scan documents. Images also taken through Camera/Mobile.
  3. Be sure, each file size does not exceed 20MB.
  4. The Admission Office will verify all the uploaded documents. Remarks will be provided in case of rejection.
  5. Document cannot be altered once it is verified. In case of correction, contact the admissions office of your respective campus.
  6. If you have any problem/query regarding uploading documents. Please contact the admissions office of your respective campus.

Please upload following Documents on Student Admission Portal and bring original on interview day.

PG – Programs

  1. SSC Marks Sheet
  2. SSC Certificate
  3. General Certificate of Education from (Cambridge) (O-Level)
  4. O-Level Equivalence Certificate from IBCC
  5. HSSC Marks Sheet
  6. HSSC Certificate
  7. General Certificate of Education from (Cambridge) (A-Level)
  8. A-Level Equivalence Certificate from IBCC
  9. Bachelor Marks Sheet (2 Years BA, BSc, B.Com)
  10. Bachelor’s Degree (2 Years)
  11. Bachelor’s Transcript (04 years)
  12. Bachelor’s Degree (4 Years)
  13. Master’s Marks Sheet (2 Years MA, MSc, M.Com)
  14. Master’s Degree (2 Years)
  15. Foreign Transcript
  16. Foreign Degree
  17. HEC Equivalence Certificate for Foreign Degree
  18. CNIC
  19. Passport (International Student).

Note:   Sufficient time is given to arrange and attach required documents so that candidates do not leave the campus during interview process to arrange these and secure their seat on same day.

 

 

(a)
Merit No.
(b)
App. No.
(c)
Name
(d)
Choice No.
1 4415 RABIA SHAHID 1
2 4442 AREEBA AHMAD 1
3 3450 AIMEN SHAFIQ 1
4 4354 BILAL GOHAR 1
5 4564 AIMEN SHAFIQ 1
6 4487 MUHAMMAD MUBEEN LIAQAT 1
7 4304 YASHARAH JAMAL 1
8 4377 SAMRA KOMAL 1
9 4461 HUSSNAIN NASIR 1
10 4363 ABRAR AHMAD ADMANA 1
11 4437 RIMSHA AAMER 1
12 4407 MUHAMMAD FAIZAN AMANAT 1
13 4322 MOMINA SHEHZADI 1
14 4345 ABEERA SHAH 1
15 4279 MUHAMMAD HUMAM 1
16 4394 AYESHA KHAN 1
17 4341 LATIF ULLAH 1
18 4286 NABIHA WAHEED KHAN 1
19 4531 ZAINAB TARIQ MUGHAL 1
20 4449 ALI USMAN 1
21 4540 MUHAMMAD BIN TANVEER 1
22 4352 MUHAMMAD ASAD EJAZ 1
23 4300 MUHAMMAD MAAZ KHAN 1
24 4302 HINA NAZ 1
25 4475 ZAINAB IQBAL 1
26 2393 SHEHLA 1
27 4395 RIDA ALI 1
28 4452 BUSHRA SAEED 1
29 4219 MUHAMMAD ASIM FAZAL SATTAR 1
30 4400 MUHAMMAD MAHAD AKHTAR 1
31 4558 HAMNA KHUSHBAKHT 1
32 4460 MUHAMMAD IBRAHIM 1
33 4444 SHEIKH HAMZA BIN JAVED 1